After reading the GD manual it recommends doing the rear loom first Andy was kind enough to point out to drill the hole at the bottom near side of the boot .I did this and then opened the hole out to accommodate all the wires .
The loom has to be fed from the cockpit . I was lucky as I could spring the top part of the mould with a wooden wedge to allow the cables to go in without having to drill a second hole
No comments:
Post a Comment