Been putting off the wiring loom but can't any more. Getting it out of the box was the first milestone and then I needed a beer! .
Using other peoples blogs and pictures that I took when at the factory I sorted out the staring point was were the loom splits to feed the two banks
|
loom laid in the right position loom is marked nearside and off side |
Then I started laying the 2 sides and hoped that things would fall naturally into place which most things do.
|
off side loom with the injectors and coil pack falling just right |
The loom splits up just before the first cylinder and goes down the off side of the engine for the O2 sensor knock sensor the starter motor cables and the all important crank position sensor. The only way I could gat the CPS fitted was to take the starter motor down again.
|
Crank position and the knock sensor ( with starter removed ) the bottom one is the unused oil level |
I noticed a wire that said coolant temp with nowhere for it to go eventually I found a blank on the right hand side with a temp sensor in the box of tricks , hey presto the supplied sensor fits in there with the doughty washer
|
coolant temp sensor (for the gauge not the engine ECU which is the other side |
Following on from this was the starter cable together are the alternator supply cables and the other cable is the start request signal really tight for space to clear the exhaust.
|
showing the alt cables and start cable ( used "P" clips in any vacant hole to try and tidy up the loom |
moving back to the top to finish off was the last 2 sensors which nicly fall into place on the throttle body and map sensor
|
off side done |
Last job on this side was to fit the off side O2 sensor which connects up but way too much cable so coiled it up to keep it away from everything and tie wrapped it to the frame.
|
O2 fitted and all the cable tie wrapped out of harms way |
Before moving to the near side I had the speedo sensor to think about ,The plug is special order from the US with an extra 30 dollars to get it here yer right, so a bit of thinking later and !!
|
speed sensor |
took out the speedo sensor and cut the shroud off to expose the pins
and then crimped 2 red though connectors on to it
|
crimped happy days
|
then is was just a matter on putting the shroud back on and filling it with epoxy proper job